The aLIGO TCS team has completed installing a pair of ring heaters on the lower SUS structure for BSC8. Electrical compliance testing was passed. Three of the four cable sub-assemblies (indentured to D1001517) are tied to the lower structure. The fourth cable sub-assembly (D1001521, indentured to D1001517) has been secured to the box frame that mates the lower to upper structures.