H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:54, Tuesday 02 September 2014 (13711)
Ops Summary
LVEA is Laser Hazard

08:29 Hugh - Going to End-X to check HEIP pump controller and put H2 actuator into run mode
09:14 Filiberto – In LVEA working on cable cleanup around the spools
09:36 Richard – In LVEA
09:45 Praxair Nitrogen delivery
09:47 Jeff K. - Going to End-Y to check the ION pump status
09:56 Peter & Rick – Going into the H1 PLS enclosure
10:07 Richard – Going to End-X
10:10 Jodi – Going to End-X and then to End-Y to check property tags
10:17 Hugh – Going to End-X
10:35 Betsy & Travis – Going into the LVEA to look for parts
10:35 Kiwamu & Lisa – Checking out electronics at ITC6
11:10 Unifirst on site to change out entryway mats
11:26 Bottled water delivery to site
11:50 Check DR chiller water level. Level is good
12:29 Filiberto – Checking for ground loops on SRM
13:00 Cris – At End-X
13:03 Karen – At End-Y
14:40 Wire delivery for Richard 