LVEA is Laser Hazard 08:29 Hugh - Going to End-X to check HEIP pump controller and put H2 actuator into run mode 09:14 Filiberto – In LVEA working on cable cleanup around the spools 09:36 Richard – In LVEA 09:45 Praxair Nitrogen delivery 09:47 Jeff K. - Going to End-Y to check the ION pump status 09:56 Peter & Rick – Going into the H1 PLS enclosure 10:07 Richard – Going to End-X 10:10 Jodi – Going to End-X and then to End-Y to check property tags 10:17 Hugh – Going to End-X 10:35 Betsy & Travis – Going into the LVEA to look for parts 10:35 Kiwamu & Lisa – Checking out electronics at ITC6 11:10 Unifirst on site to change out entryway mats 11:26 Bottled water delivery to site 11:50 Check DR chiller water level. Level is good 12:29 Filiberto – Checking for ground loops on SRM 13:00 Cris – At End-X 13:03 Karen – At End-Y 14:40 Wire delivery for Richard