Reports until 08:41, Thursday 04 September 2014
H1 PSL (PSL)
peter.king@LIGO.ORG - posted 08:41, Thursday 04 September 2014 (13751)
PMC and Reference Cavity Transmissions Since Re-alignment
Attached is a plot of the reference cavity transmission and pre-modecleaner reflection signals.  Both have drifted slightly since the re-alignment on Tuesday.
Images attached to this report