Reports until 09:58, Friday 05 September 2014
LHO General
Link
gerardo.moreno@LIGO.ORG -
posted 09:58, Friday 05 September 2014
(13774)
Morning Meeting Minutes
Jim W. ITMX ISI testing ongoing.
Hugh, HAM4 Optical lever -> SUS -> Code. Optical lever is on the works.
HAM4, ISI TF investigation.
HAM5, ISI TF ongoing.
Richard, continue with chassis builds, look into seting up camers/illuminators.
Gerardo, FC applied to test ITM for electrometer measurements today.
John reported a chiller triped at the corner station, temperature in the VEA went up, but should be under control soon.