I have re-attached the LVEA test stand switches* to their respective H1 networks so that the front-ends may be used again. This involved re-patching in the MSR (links via the H2B), and re-enabling the trunk ports on the MSR FE and DAQ switches (sw-msr-h1fe, sw-msr-h1daq). *( sw-lvea-h2fe, sw-lvea-h2daq - for historical reasons)