S. Dwyer, G. Grabeel Completed the alignment of the HWS on the ISC table and end-Y for TCS. The green laser had some alignment issues after the power outage that a burt restore didn't fix. Sheila and I put the PZTs in the middle of their range of motion and realigned the beam onto the QPDs. After the green beam was aligned with the irises and centered on the QPDs I began aligning the TCS HWS side of the ISC table. The new layout worked really well and I was quickly able to get a good looking beam on the HWS. Unfortunately there is an issue with an incorrect pinout on the HWS cable so I will not be able to get the camera running just yet.