With installation ramping down, Vern will be chairing the morning meeting for the Detector Group. Meetings will be on Monday, Wednesday, and Friday, starting at 08:30.
OpLevs – Need laser safe to continue work on HAM5.
Ongoing alignment and problem resolution work at ITMX and ITMY.
Glitches with the BS OpLev laser are being looked into.
Seismic – Continuing work on ITMX control loops stability.
Commissioning on the various HAM HEPIs.
Electrical – Pulling cables and power distribution configuration in the LVEA.
Work on the Chiller 3 tripping problem.
Reconnecting Staging Building fire system to the alarm distribution panel in the OSB