Reports until 09:27, Monday 08 September 2014
H1 General
jeffrey.bartlett@LIGO.ORG - posted 09:27, Monday 08 September 2014 (13805)
08:15 Meeting Minutes
   With installation ramping down, Vern will be chairing the morning meeting for the Detector Group. Meetings will be on Monday, Wednesday, and Friday, starting at 08:30.

OpLevs – Need laser safe to continue work on HAM5. 
               Ongoing alignment and problem resolution work at ITMX and ITMY. 
               Glitches with the BS OpLev laser are being looked into.

Seismic – Continuing work on ITMX control loops stability.
                Commissioning on the various HAM HEPIs.
 
Electrical – Pulling cables and power distribution configuration in the LVEA. 
                  Work on the Chiller 3 tripping problem. 
                  Reconnecting Staging Building fire system to the alarm distribution panel in the OSB