Nic, Dan
Here is a short checklist outlining the short term plan for the OMC. Many of these times require interferometer time so will need to be coordinated with other activities.
-
Due to the new TT actuation matrix, we must recommission the dither alignment servos.
-
Do the tests/characterization described in Zach’s OMC manifesto elog.
-
Compile OLGs of all servos in their desired state.
-
OMC transmitted noise should be characterized, a good reference for the RIN incident on the OMC will be IFO-REFL (the ISS isn’t working right now).
-
OMC length noise has not been measured yet, this one seems like a high priority.