BSC 8 SUS work
BBland (for Bartlett, Sadecki, Ramirez, Garcia, Cook, etal.)

This week, the crew:

1) Made the M0 PUM loop.
2) Prepped the M0 chain via moving it to it's parking spot in the LVEA fiber room where it won't be moved for the next few weeks while the monolithic build takes place. Also, we mounted the triple hang tooling and Doug started to setup IAS to look at the hanging dummy PUM.  Note, the TM is still removed so we'll take this first pointing fiducial with the UIM and PUM only hanging (no TM), which is the same state we will restore when we swap in the glass PUM and it's wire loop.
We still need to finish leveling the setup before Doug's first look.
3) Laced the FMy cables (D1000234-125" s/n 900, 901, 902) up the structure and PEEK xip-tied them.  
4) Mounted the newer, functioning version of the pseudo feedthru to the test stand and connected the rack cables.  

We still need install the SRS cables between the 125" and feedthru, which will takes some fussing to mate to the ISI properly.  We'll broker with SEI for more time and guidance on this.

5) Assembled the beginnings of the Table Cable Brackets (3 for this table).

6) Gerardo continued measurements of the crooked ITMy TCP (CP09) in an attempt to find a path forward to gluing the SST prisms onto it.  He reports that this is challenging...