SUS work on BSC8 test stand Electrical work on air conditioning for electronics building is nearly complete. delivery pickup Unifirst delivery Praxair delivery to CP8 Filiberto made cable length measurements in the LVEA Michael R. changed H1 PSL dust monitor to the new Met One 6000 series model. I updated the code again. Plots of dust counts > .5 microns attached. The dust monitor at location 7 (near the previous location of the H2 electronics racks) seems to have disconnected. The dust monitor at location 6 (the H1 PSL diode room) has been disconnected for about a week or two.