Today, the cabling for FMY was mostly completed with the exception of the M1 - F1, F2, F3, LF outputs. The M2 and two of the M1 outputs were connected and confirmed via the medm for the input filters. The clamps to the BSC-ISI optical table will be installed tomorrow morning and re-routing of the extension cables will continue. The work today established the correct cabling from each OSEM sensor to the readout signal in medm. M2 (UL, UR, LL, LR): The cables from each OSEM (D1000234 - 125") were then connected to the extension cable (D1000225 - 199") that went to the new SUS feed-through plate. For the cable of D1000234-type, the S/N is 902. The extension cable S/N is 1104781. M1 (RT,SD): The cables for only the RT and SD OSEM were connected and confirmed via the medm readout. The D1000234-type cable S/N is 901. The D1000225-type cable has a S/N of 779. M1 (F1,F2,F3,LF): The SUS feed-through plate on the mechanical test stand will need to be adjusted to accommodate the extension cable (D1000225 - 199"). The plate did not leave enough room to squeeze this cable in without rubbing against the (dirty) Test Stand.