Displaying report 1-1 of 1.
Reports until 10:02, Thursday 25 September 2014
H1 PSL (PSL)
peter.king@LIGO.ORG - posted 10:02, Thursday 25 September 2014 (14141)
ISS PD Array Picomotor Cable Pulled
The in-air cable for the Picomotor (PM5) was pulled.  Labelled H1PSL-ISS_PM5.  Goes from HAM2 flange D6-F12 to Picomotor controller #5, channels 5-8.

This Picomotor steers the beam before the mode matching telescope to the ISS photodetector array.

See D1002873 for flange nomenclature.

Work permit 4868.


Fil, Peter
Displaying report 1-1 of 1.