Displaying report 1-1 of 1.
Reports until 15:31, Thursday 25 September 2014
H1 PSL (PSL)
sudarshan.karki@LIGO.ORG - posted 15:31, Thursday 25 September 2014 - last comment - 09:25, Friday 26 September 2014(14154)
HAM2 Picomotor

Gabriele, Peter K., Daniel, Sudarshan

HAM2 Picomotor Channel List:

From our capacitance measurments (LHO: alog 14148), and the cable specification drawings: D1000581  and D1101515, we concluded that the picomotor on HAM2 are connected to the following channels:

Channel        Picomotor

1                     ISS (PM1-closer to the array)

2                     IM4 Transmission QPD 

3                     Faraday Half Wave Plate

4                     IMC Input Pointing

8                     ISS (Before the telescope) 

5, 6, 7             Empty

This is consistent with the channel assignment at LLO alog 12174

During the process we moved the Faraday HWP (Channel 3) and IMC Input Pointing (Channel 4) quite a bit, but we brought it back to its original position, atleast on theory. We moved these the same number of steps back as we moved forward and viceversa. :)

Comments related to this report
daniel.sigg@LIGO.ORG - 09:25, Friday 26 September 2014 (14168)

Picomotor code and wiki updated to reflect the revised motor assignment.

Displaying report 1-1 of 1.