9:37-11:40 Heading to End Y to check AA chassis – Sudarshan 10:25 Going to End Y – Richard 10:26 PSL model h1psliss restart – Dave/Peter/Gabriele 10:26 DAQ restart – Dave 11:06-11:48 Working at MidY – Karen 11:15 RF amplifier chassis installation in H1 PSL – Filiberto/Peter 11:52 Install Pcal beam localization camera housing on A1 adapter window flange at EndX/EndY – Rick/Travis/Sudarshan 11:56 Taking some connectors to Filiberto in the LVEA – Ed 11:58 Back to Mid Y – Karen 12:22 Heading to work inside the beam tube enclosure between Mid Y/End Y – Robert 13:09 Going to End Y to replace the laser and re-align the Oplev – Jason 13:26 Heading into the LVEA (HAM1)- Hugh 13:31 Searching for TMS parts at EndX – Jeff B 13:51 Returned from HAM1 – Hugh 14:24 Back from End Y – Jason