LHO General
patrick.thomas@LIGO.ORG - posted 18:44, Tuesday 20 September 2011 (1432)
Ops Shift Summary
Gas bottle delivery
HR workshops

Activities listed on the white board:
LVEA:
PSL diode / chiller room
SUS / SEI test
squeezer / H1 restore
triage clean storage
welding setup
ICC @ HAM 7,8
HEPI Welding HAM 9

EX:
BSC 5 set, pier set

MY:
oplev test

EY:
ICC @ BSC 6
RGA @ BSC 10
Transmon assy
HEPI Station Run

Plots of > .5 micron dust counts attached. I still need to investigate the dust monitor at location 1 in the LVEA (ISCT 4). The dust monitor at location 7 in the LVEA (near the previous location of the H2 PSL racks) dropped out for a while for an unknown reason. Michael R. replaced the fuse, but this did not appear to fix the problem.