Gas bottle delivery HR workshops Activities listed on the white board: LVEA: PSL diode / chiller room SUS / SEI test squeezer / H1 restore triage clean storage welding setup ICC @ HAM 7,8 HEPI Welding HAM 9 EX: BSC 5 set, pier set MY: oplev test EY: ICC @ BSC 6 RGA @ BSC 10 Transmon assy HEPI Station Run Plots of > .5 micron dust counts attached. I still need to investigate the dust monitor at location 1 in the LVEA (ISCT 4). The dust monitor at location 7 in the LVEA (near the previous location of the H2 PSL racks) dropped out for a while for an unknown reason. Michael R. replaced the fuse, but this did not appear to fix the problem.