Reports until 16:03, Tuesday 07 October 2014
LHO General
gerardo.moreno@LIGO.ORG - posted 16:03, Tuesday 07 October 2014 (14342)
Ops Shift Summary

8:17 am, Peter K and Rick S working inside the H1 PSL laser enclosure.
8:20 am, Hugh to CS VEA, survey of different chambers for CPS grounds.
8:50 am, Patrick from CS CR, conlog work, see his entry for more information.
9:28 am, Hugh to visit both end stations, continue with survey for CPS grounds.
9:30 am, Dave and Jim from somewhere in the CS, work per WP#4887.
9:37 am, Filiberto to visit both end stations, work on WP#4892.
9:48 am, Cyrus to Y-End station VEA, work on HWS computer.
10:10 am, Travis and Betsy to CS VEA, West bay work.
10:52 am, Aaron to CS VEA, install camera cable for TCS-Y, close to BSC1.
12:10 pm, Hugh to CS VEA, to add/install CPS ground @ BSC1.
12:15 pm, Krishna to X-End VEA, UW-PEM work.
1:30 pm, Filiberto to visit both End Stations, new location of cables need new labels.
1:56 pm, Betsy to CS VEA, work @ West bay, drill on hand.
2:12 pm, Jason and Doug to CS VEA, retrieve equipment.<---did not retrieve it but equipment was located.
2:35 pm, Filiberto to X-End station, power cycle equipment.
3:10 pm, Dave and Jim to X-end station, bring up equipment after power cycle.
3:21 pm, Andres and Jeff to visit both end stations, retrive parts/components.
3:52 pm, Travis to CS VEA, locate and retrive missing laser power meter that someone swiped.