H1 AOS
virginio.sannibale@LIGO.ORG - posted 19:52, Wednesday 21 September 2011 - last comment - 10:30, Thursday 22 September 2011(1438)
TMS: Mass Budget
Taken picture of the TMS ISC table to survey the components already mounted on the table

What it is  clearly missing are the two periscopes, the glass baffle, the glass beam dump, and some connectors.

Picture of the underside of the table should show that all the ballast masses are there

The total current weight of the table is 52.5 kg  (Keita)


Images attached to this report
Comments related to this report
keita.kawabe@LIGO.ORG - 10:24, Thursday 22 September 2011 (1440)
What were missing from the table when the weight of the table was measured 52.5kg, as far as I can tell:

2xHAM connector brackets (in the picture, but they were not there when measured).

Beam diverter cable, cable clamps, and a 25pin connector (not yet installed).

Total of 9 posts with black glass mount and total of 10 glass plates to be mounted on the posts (total of 10, not 9, because one of the posts will have two plates) (not yet installed).

Tiny black glasses behind high reflectors and tiny aluminum holders for them (not installed yet).
keita.kawabe@LIGO.ORG - 10:26, Thursday 22 September 2011 (1441)
And neither of two periscope assemblies (including mirrors) are not included in the weight, as they are not yet installed.
keita.kawabe@LIGO.ORG - 10:30, Thursday 22 September 2011 (1442)
And most importantly, this is H2!

H2!!!!!!