- Lots of visitors, for SUS, fiber pulling, TMS assembly, and HR program
- Reiboldt working on roof of H2 PSL
- Mount's Lock and Key, Stoneway Electric on site
- Patrick working on dust monitors in the LVEA
- H1 was running (stays locked through Detect) today during Laser Safe operation. Squeezers transitioned to Laser Hazard at ~18:15 to access beam enclosures.
- H1 TCSY flipper M2 alarmed but that's OK, as no laser power is being transmitted
- EY: HEPI pumping ongoing