H1 AOS
edmond.merilh@LIGO.ORG - posted 16:02, Friday 10 October 2014 (14397)
Ops Daily Summary

~Two more 5.2mag aftershocks this morning on the Southern East Pacific Rise near Easter Island~ 

08:00 Morning checklist: Reset ALH; vacuum system looks ok - HAM6 cold cathode pressure reporting 10-7;  CDS/DAQ - everything looks normal.

08:30 Morning meeting

08:42 Krishna to X-End to do some BRS testing/tweaking

09:20 Krishna back from X-End

09:50 Keita to End Y to align green WFS. He will be using ETMY/ITMY/BS/PR3

10:14 Dale into the control room with a tour group

12:04 Jason to End X to align OpLev

12:30 Adjusted ISS Diffracted power to ~9.5% by reducing the refsignal voltage from -2.01 to -2.05

12:37 Jason back from End X

14:45 Sudarshan into LVEA, crawling under HAM2

12:48 Keita back into control room from End Y

12:50 Sudarshan back from crawling