08:28 - 08:53 cdsfs0 down 08:56 Joe G. to LVEA to retrieve PCAL viewport protector from shelf 09:02 Aaron to pull cables for PCAL (WP 4896) 09:03 Filiberto to end X and end Y to pull cables for HEPI pressure sensors (WP 4905) 09:04 Ed to end X and end Y to check ESD AI chassis filter board versions (WP 4902) 09:11 Jeff B. and Andres looking for parts in optics lab 09:14 John hard-closing GV18 for PCAL viewport protector replacement work (WP 4903) 09:17 Joe G. and Rick to end Y to replace PCAL viewport protector (WP 4903) 09:28 Hugh troubleshooting sensor problem at ITMX (WP 4899) 09:31 Sudarshan and Shivaraj to end X to work on PCAL cabling 09:36 Jeff K. making changes to end X ISI and HEPI models, restarting models 09:40 Contractor to see Bubba and John 09:54 Jeff B. and Andres done in optics lab 10:01 Jeff K. done with model changes and restarts, ready for DAQ restart 10:13 Joe G. and Rick done replacing PCAL viewport protector 10:22 Richard to LVEA to trace HEPI pressure sensor cables 10:29 Unifirst delivery 10:29 Cyrus working on h1broadcast0, restarting 10:31 Kyle reopening GV18 10:35 DAQ restart, error from duplicate channels in Beckhoff 10:58 Richard routing HEPI pressure sensor cables 11:00 Ed done, replaced both boards 11:00 Hugh back to BSC2 11:23 Cyrus done work on h1broadcast0 11:24 Richard done routing HEPI pressure sensor cables 11:44 Daniel done making Beckhoff changes (WP 4904) 11:48 Hugh done in LVEA 13:09 Kyle and John running purge air compressor at end Y (WP 4907) 13:09 Doug and Jason retrieving parts from LVEA 13:42 Doug and Jason done retrieving parts 13:44 Doug and Jason to end Y to realign optical lever 14:08 Ed to SUS test stand, checking UIM chassis 14:20 Doug and Jason done aligning end Y optical lever 15:18 Shivaraj and Patrick updating PCAL Beckhoff code at end X 15:20 Kyle and John done running purge air compressor at end Y