8:00 LVEA is LASER HAZARD with Limited Access 8:20 ISS Diffracted Power was set to the proper values range. 9:00 Quick visit to the LVEA (with commissioner’s authorization)- Hugh/Mitchell. 9:10 Back from LVEA – Hugh/Mitchell 9:30 Testing PCAL channels at EndX VEA – Patrick/Shivaraj 9:35 Optics alignment on ISCT1 table by HAM1 – Kiwamu 9:44 Heading to EndY – Kyle 10:05 Returned from the LVEA – Kiwamu 11:09 Back from EndX – Patrick,Shivaraj 11:42 Kyle is back from EndY 11:45 Heading into the LVEA (checked with commissioners) – Betsy 13:51 Heading into the LVEA (checked with commissioners) – Travis/Krishna 13:58 Back from LVEA – Travis/Krishna