aidan.brooks@LIGO.ORG - posted 15:00, Monday 27 October 2014 (14648)
HWSY fix installed. Probe beam returns from ITMY

I installed the changes to the HWSY optical layout per T1400686. To do this, I:

The return beam is shown below. I still need to move the HWS to the conjugate plane of ITMY and determine the magnification between those planes.

 