Around 30 July, the Assembly was moved from the Test Stand to the Transportation container. I'll attach a couple photos here; find several more in my web space here. We are currently boiling nitrogen into the container and logging the humidity. After a couple hours the humidity exhausting from the container has dropped to 16% from 32%. We expect to get a container volumes worth(not accounting for the ISI) through in less than four hours at our flow rate. Before the end of the day we'll throttle back a go slow through the weekend. Monday we'll download the humidity log and close all the valves. The last photo below shows the N2 Dewar attached to the container. The exhaust is plumbed into a bag containing our humidity logger on top of the box.