Reports until 16:00, Wednesday 29 October 2014
LHO General
patrick.thomas@LIGO.ORG - posted 16:00, Wednesday 29 October 2014 (14701)
Ops Summary
08:55 Karen cleaning at mid and end Y
09:03 Ed reinstalling UIM driver for quad test stand
09:05 Hugh bringing HAM2 ISI down to make a safe.snap file
09:24 Gerardo and Alexa transitioning end Y to laser safe (WP 4923)
09:32 Alastair to install FLIR imaging camera on TCS Y table (WP 4924) ... not done, parts need to be made
09:45 Gerardo and Alexa done transitioning end Y to laser safe
10:03 Hugh taking HAM3 down to upgrade matrices and make a safe.snap file
10:12 Truck at gate here to pump septic tank
10:45 Hugh removing malfunctioning HEPI pressure sensor box at BSC2
10:47 Doug cataloguing the status of the switches on the optical lever whitening boards in the LVEA
11:02 Hugh done at BSC2
11:18 Travis moving suspension upper structure into clean room in West bay (heavy)
11:33 Travis done
12:08 Doug done
12:31 Betsy to West bay for 3IFO quad work
12:57 Doug cataloguing the status of the switches on the optical lever whitening boards at the end stations
13:26 Karen done cleaning at mid and end Y
13:48 Hugh to BSC2 to reinstall HEPI pressure sensor box
14:05 Hugh done at BSC2
14:38 Doug in LVEA recording locations of optical lever equipment
14:45 Delivery for Richard
14:45 Doug done