Reports until 16:20, Wednesday 29 October 2014
H1 AOS (AOS, SUS)
douglas.cook@LIGO.ORG - posted 16:20, Wednesday 29 October 2014 - last comment - 09:16, Friday 31 October 2014(14711)
optical lever rack/chassis locations and whitening chassis status
Optical Lever Whitening Chassis Rack Locations and Chassis Locations and Current Binary Output Module Status at LHO: D.Cook 10/29/2014
Rack SUS H1-R1: Chassis cabled - Board 1- HAM 2 = No BOM installed
		  Chassis cabled - Board 2- HAM 3 = No BOM installed	
Rack SUS H1-R2: Chassis cabled - Board 1- HAM 2 = No BOM installed
		  Chassis cabled - Board 2- PR3  =  BOM installed
				B1, B2, B4, B9, B10, B12, 17, B18, B20, B25, 26, B28 set HIGH
				(the rest set LOW)
Rack SUS H1-R3: Chassis cabled - Board 1- HAM 5 = No BOM installed
				  Board 2- SR3 = BOM installed
				  B4, B12, B20, B28 set HIGH
 Rack SUS H1-R4: Chassis cabled - Board 1- HAM 4 = No BOM installed
		  Chassis not cabled - Board 2- Empty
Rack SUS H1-R5: Chassis cabled - Board 1- BSC 8 Pier (temp ?) = No BOM installed (jumpered connecter)
		  Chassis cabled - Board 2- BS  =  BOM installed
				B1, B3, B4, B9, B11, B12, 17, B19, B20, B25, 27, B28 set HIGH
				(the rest set LOW)
Rack SUS H1-R6: Chassis cabled - Board 1- ITMx =  BOM installed
				B4, B5, B12, 13, B20, B21, B28, B29 set HIGH
				(the rest set LOW)
   Chassis not cabled - Board 2- Empty
Rack SUS H1-R1 ETMy: Chassis cabled - Board 1- ETMy = BOM installed
				B4, B5, B12, 13, B20, B21, B28, B29 set HIGH
				(the rest set LOW)
		  Chassis not cabled - Board 2- Empty

Rack SUS H1-R1 ETMx: Chassis cabled - Board 1- ETMx = BOM installed
				B2, B3, B5, B10, B11, B13, B18, B19, B21, B26, B27, B29 set HIGH
(the rest set LOW)
Chassis not cabled - Board 2- Empty
Non-image files attached to this report
Comments related to this report
jeffrey.kissel@LIGO.ORG - 09:16, Friday 31 October 2014 (14768)
This entry has several bugs making the data incorrect. A corrected status chart can be found in LHO aLOG 14749