LVEA: Laser Hazard Observation Bit: Commissioning 08:00 Alarm on Mid-X Instrument Air; informed the vacuum group 08:18 Aidan – In LVEA to check TCS laser 08:40 Travis – Going to both end stations to work on PCal cameras 08:55 Robert & Sudarshan - End-X to work on PEM 09:00 King Water – On site for water sampling 09:25 Bubba – Repaired Instrument Air compressor at Mid-X 09:30 Filiberto – End-X to work on PEM cabling 10:05 Jodi & Gary – At Y-End 10:45 Betsy & Sheila – In LVEA for quick survey 13:05 Alistar – Working on TCS in LVEA 13:30 Dave – DAQ restart 14:38 Jeff K. – Going to X & Y end stations to take pictures of OpLevs 15:18 Robert – In the beam tube enclosure between Mid and End-Y