08:00 LVEA is LASER HAZARD
08:15 Checked PSL status
08:37 Karen @end-Y - report of water leaking over light fixture in mechanical room and also under roll-up door.
08:45 Alistair and Eric out to LVEA/LASER tables
08:49 Jeff out of LVEA
08:50 Karen leaving end-Y
09:10 Took Seismic, safely, offline so that Jeff could updat SUS models
09:13 reset watchdog accumulators. note: all involved chambers were able to be reset using reset all except for HAM3. rest WD only was the only way to reset.
09:21 request from Jody for LASER safe.
09:25 Keita will transition LVEA to LASER safe
09:43 Dave B doing DAQ restart #1
09:50 Krishna back from installing thermometers for BRS @ end-X. ws there since 7:45.
09:56 Keita reports that due to the fact that the TCS team has their tables open the LVEA will remain LASER HAZARD.
11:34 Kyle going to Y-end to take pictures
11:58 Kyle leaving Y-end
12:02 Alistair and Eric out of LVEA
12:06 Betsy and Travis to align Quad in W Bay for about 2 hours.
13:15 Jim out to CER to reset an STS
13:20 Andres out to W Bay
13:28 Andres out of LVEA
13:30 Alistair et al to the H2 PSL enclosure. Approval was given by commisioners.
13:55 Betsy and Travis out of LVEA
15:08 Eric, Gerardo and Alistair out of the H2 PSL/LVEA
16:00 Gerardo out to LVEA to adjust cameras for commissioners