Reports until 13:44, Tuesday 04 November 2014
H1 CDS (CAL)
david.barker@LIGO.ORG - posted 13:44, Tuesday 04 November 2014 (14840)
New CAL models in end stations, h1calcs not installed today

Dave, Joe B, Keith T [WP #4929]

End Stations: I built and installed the end stations cal models (PCAL) h1calex and h1caley. The main change is that the PCAL part is now a common library link.

OAF Front End: The core assignments for the h1calcs, h1pemcs, h1tcscs  and h1odcmaster were modified to match with the L1 settings:

model cpu was cpu is
h1calcs - 2
h1oaf 3 3
h1pemcs 2 7
h1tcscs 4 8
h1odcmaster 5 9

the recompile of h1tcscs initially failed due to an outstanding merge issue with TCS_MASTER.mdl. I reverted this file back to the last stable version and the rebuild proceeded.

the compile of h1calcs failed due to missing IPC channels from the LSC model. I have abandoned this install for today and will see if I can complete it next Tuesday (11/11) if permission to change LSC is granted. This keeps the WP open.