Displaying report 1-1 of 1.
Reports until 17:34, Friday 30 September 2011
LHO General
patrick.thomas@LIGO.ORG - posted 17:34, Friday 30 September 2011 (1487)
dust monitors
Filiberto C. fixed the communication wiring to the dust monitor at location 7 in the LVEA (near the previous location of the H2 electronics racks). Michael R. swapped the dust monitor at location 10 in the LVEA (for the H1 PSL enclosure) back to the 227B model.
Displaying report 1-1 of 1.