Reports until 16:00, Friday 07 November 2014
LHO General
edmond.merilh@LIGO.ORG - posted 16:00, Friday 07 November 2014 (14906)
Daily Ops Summary

*note: Observation Intent Bit was set to "green" at some point last night. The aLog did not reflect this action. Also, aLog crashed sometime after 10:55 last night.

*note: Intent bit was not set to "commissioning" until 08:39

*Suggest that notification be posted for cleaning crews at main access points IF actual intention is for NO acces to (L)VEAs be granted as long as OIB is set to "green"

*note: Accesses made to LVEA while OIB set to "green": (this is purely FYI as cleaning crews have generally been given access prior to 08:00AM.) 

06:43 Cris into LVEA

07:08 Cris out of LVEA

07:09 Cris into LVEA

08:00 Daily Checklist performed. (Observation Intent Bit*) Nothing out of the ordinary to report. Every point functioning nominally.

08:!5 Betsy into LVEA

08:25 Karen into LVEA

08:32 Betsy out of LVEA

08:33 Karen out of LVEA

08:39 Observation Intent Bit set to "commissioning"*

09:00 Jeff and Andres into LVEA

09:12 Kyle headed to both end stations

09:18 Fil out to EX

09:50 Fil back from EX

09:58 Kyle back from Ends

10:00 Reservation System used to note commissioning activity

10:20 Suresh into LVEA w/comm appr

10:20 Mitch out of LVEA

10:14 Dale informed me of a group of high schoolers in for a tour ~13:00ish.

11:03 Corey out to LVEA w/comm appr

11:18 Suresh out of LVEA

11:30 Kyle informed me of a chilled water leak in the mechanical room. This leak is non-consequential to anything critical and he should have it repaired sometime after lunch.

11:31 Jeff and Andres out of LVEA

12:23 Krishna headed to EX. Not going into VEA.

12:51 Suresh backk into LVEA

13:37 Jeff and Andres into LVEA w/comm appr

13:38 Dale with tour group into control room ~10min

14:28 Jeff and Andres out of LVEA

15:30 Corey in control room with tour ~5min

15:39 Corey with tour out to roof.