Reports until 11:56, Friday 07 November 2014
H1 PSL
edmond.merilh@LIGO.ORG - posted 11:56, Friday 07 November 2014 (14915)
ISS maintanance

Diff Power seemed to be creeping towards the high 9% range. The REFSIGNAL voltage was set to -2.04 from -2.02. The result is 7.5% diff power.