Reports until 09:04, Monday 10 November 2014
H1 PSL
edmond.merilh@LIGO.ORG - posted 09:04, Monday 10 November 2014 (14942)
ISS Maintanace

This morning ISS diff power was at ~11.6%. REFSIGNAL was @ -2.02V. I adjusted REFSIGNAL to -2.11. diff power is currenly at ~7%.