Second cleaning took place this morning. Garbing and staging cleanrooms were moved into place around the chamber cleanroom. Garb and contamination control supplies were stocked. Particle counts were taken and since they looked good (at both the 72" height and floor level) and purge air was on, the north door was removed. The door blank on the west side of the chamber was also removed.