- H2 PSL work continues with help from Peter King and the visiting group from Germany
- EY: Painting of the VEA floor
- EY: Cyrus heads down to EY to pull a cable
- Patrick installs a dust monitor at the H2 PSL
- ICC in HAM10
- H1 TCS Lasers turned off due to temperature anomalies. Tidal file regenerated. Good duty cycle today, as H1 locked up to OMC locking on its own.