H2 SUS
betsy.weaver@LIGO.ORG - posted 21:44, Sunday 09 October 2011 (1525)
ITMy monolithic work
Last week, the ITMy compensator plate (CP09) was transported to the LVEA and installed into the QUAD reaction chain lower structure.  It was suspended from it's loop and found to hang decently.  Apon hanging the CP, RePUM, and ReUIM as a triple unit, we found the CP was hanging at 1.6mRad, so we proceeded to lock it down in prep to reattach it to the main chain.  Pictures are on ResourceSpace:

https://ligoimages.mit.edu/?c=761

Note that in the pictures, the Reaction Chain with the CP (left) is sitting in front of the Main Chain (right) in order to gain access to the IAS equipment to the right of the cleanroom.