Reports until 09:58, Tuesday 02 December 2014
H1 General
travis.sadecki@LIGO.ORG - posted 09:58, Tuesday 02 December 2014 (15371)
Diode Room Crystal Chiller check

Checked the Diode Crystal chiller as per OPS checklist and noted that it was full (midway between max and min level).  Log on the front of the chiller shows that Peter King added 250ml on 12/1.