ICC in HAM-10 is complete. Wipe down, second vacuum, inspection, and sampling were all finished before lunch. The tube blank and the door were replaced after lunch. FTIRs will be sent off tomorrow. Work permits were pulled, signed, and filed for ICC at HAM-9/BSC-4. We'll start staging there tomorrow.