ITMy BSC8 SUS work
Over the last day or two we have continued to add SUS payload to the BSC8 ISI:

Cabling - We have spent a bit more time than I anticipated routing the 27 SUS cable strands up (and down) the ITMy and FMy suspensions, and the 7 SEI/SUS handoff cables across the optical table and out to the ISI stacks.

Cable brackets CB1, 2, 3, and 4 are mounted along with a handful of PEEK D1000600 cable clamps.

(4) Vibration Absorbers and (6) Sheer Plate Dampers were attached to the FMy.

Stays - After getting them hot out of the oven today, we made an attempt to attach them to the FMy.  Unfortunately, the overall length of the stay is too long to mate up to the suspension structure properly.  Fortunately, Kurt will be on site tomorrow and can help us sort out exactly what part has the problem and work out triage for the stays needed on this suspension now.

Comments related to this report
betsy.weaver@LIGO.ORG - 21:02, Tuesday 11 October 2011 (1545)


		
		
Images attached to this comment
betsy.weaver@LIGO.ORG - 21:09, Tuesday 11 October 2011 (1547)
FMy Shear Plate Dampers and Vibration Absorbers.