Reports until 16:04, Thursday 04 December 2014
LHO General
edmond.merilh@LIGO.ORG - posted 16:04, Thursday 04 December 2014 (15438)
Daily Ops Log
Day Shift Notes 12/4  (Corey covering for Ed in morning)
 
FMCS Critical Alarm for mid-station chiller alarms:  THESE CAN BE REMOVED; SHOULD NOT BE CRITICAL.
 
7:14 Karen in LVEA
7:20 Chris in LVEA
8:15 Contractor arrives to help with trench work
8:40 EX terminating cables (Aaron)
08:53 Doug and Corey out to LVEA to tke OpLev pictures
07:14 Karen into VEA
07:20 Chris into LVEA
08:15 Contractor arrives to help with trench work
08:40 EX terminating cables (Aaron)
09:00 Fil into LVEA to survey for PEM cabling
09:03 Betsy and Travis out to LVEA
09:40 Keita out to EX
10:00 Sudarshan out to EX
10:27 Aaron and co. back from EX
10:35 Keita back from EX
10:44 Sudarshan back from EX
11:00 Despite really bad ground shaking from work going on outside, the IMC seems to be stable. ALS - not so much. X arm locked back up. Y-arm kept mode hopping for a while until the commissioners put it back right.
11:00 MEDM Training - Control Room
15:00 Operators Meeting - Main conference room
15:02 Gerardo out to H2 LASER enclosure
 
FMCS Critical Alarm for mid-station chiller alarms:  THESE CAN BE REMOVED; SHOULD NOT BE CRITICAL.
 
7:14 Karen in LVEA
7:20 Chris in LVEA
8:15 Contractor arrives to help with trench work
8:40 EX terminating cables (Aaron)
08:53 Doug and Corey out to LVEA to tke OpLev pictures
 
FMCS Critical Alarm for mid-station chiller alarms:  THESE CAN BE REMOVED; SHOULD NOT BE CRITICAL.
 
7:14 Karen in LVEA
7:20 Chris in LVEA
8:15 Contractor arrives to help with trench work
8:40 EX terminating cables (Aaron)
08:53 Doug and Corey out to LVEA to tke OpLev pictures