LVEA: Laser Hazard Observation Bit: Commissioning 07:15 Karen & Cris – Cleaning in the LVEA 09:00 Tweaked the ISS Reference Signal voltage to raise Diffracted Power up to 7.5% 09:00 Peter – Working in the Diode Room 09:00 Travis & Sudarshan – Going to End-Y to work on PCal cameras 09:19 Andres – Working in the 3IFO Storage Container cleanroom & looking for TCS parts 09:28 Filiberto & Aaron – Cabling work in the HAM3 area 09:43 Mitch – Going into the LVEA to work on Elliptical baffle 10:11 Rick S. – Going to End-Y 10:20 Dave – Going to End-Y to work on camera 10:35 Mitch – Out of LVEA 10:37 Karen – Going to End-Y for cleaning 10:57 Dave – Back from End-Y 11:00 Kyle – Going to End-Y 11:01 Travis – Going to End-X 11:07 Platt Electric on site to deliver electrical parts. Richard will escort 11:00 Turn off sensor correction while Travis is at End-X 11:14 Sudarshan – Back from End-Y 11:20 Kyle – Back from End-Y 11:45 Andres – Out of LVEA 11:48 Gerardo – Turn on cleanroom fans at HAM1/2 11:51 Rick, Travis, & Sudarshan – At End-Y installing camera 12:12 Filiberto & Aaron – Out of the LVEA 12:30 Filiberto & Manny – Going to End-Y & End-X for PCal camera work 12:59 Aaron – Measuring power output at HAM3 area 13:28 Corey – Out of H2/Squeezer bay 13:40 Andres – Going into the LVEA looking for parts 13:40 Bubba – Going to Mids and Ends to drop off filters 14:16 Andres – Out of LVEA 14:55 Travis & Sudarshan – Going to End-X to work on PCal camera 15:19 Rick – Going to End-Y to work on PCal cameras