Reports until 16:07, Friday 05 December 2014
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:07, Friday 05 December 2014 (15474)
Ops Day Shift Summary
LVEA: Laser Hazard
Observation Bit: Commissioning  

07:15 Karen & Cris – Cleaning in the LVEA
09:00 Tweaked the ISS Reference Signal voltage to raise Diffracted Power up to 7.5% 
09:00 Peter – Working in the Diode Room
09:00 Travis & Sudarshan – Going to End-Y to work on PCal cameras
09:19 Andres – Working in the 3IFO Storage Container cleanroom & looking for TCS parts
09:28 Filiberto & Aaron – Cabling work in the HAM3 area
09:43 Mitch – Going into the LVEA to work on Elliptical baffle
10:11 Rick S. – Going to End-Y
10:20 Dave – Going to End-Y to work on camera
10:35 Mitch – Out of LVEA
10:37 Karen – Going to End-Y for cleaning
10:57 Dave – Back from End-Y
11:00 Kyle – Going to End-Y
11:01 Travis – Going to End-X
11:07 Platt Electric on site to deliver electrical parts. Richard will escort
11:00 Turn off sensor correction while Travis is at End-X
11:14 Sudarshan – Back from End-Y
11:20 Kyle – Back from End-Y
11:45 Andres – Out of LVEA
11:48 Gerardo – Turn on cleanroom fans at HAM1/2 
11:51 Rick, Travis, & Sudarshan – At End-Y installing camera 
12:12 Filiberto & Aaron – Out of the LVEA
12:30 Filiberto & Manny – Going to End-Y & End-X for PCal camera work
12:59 Aaron – Measuring power output at HAM3 area
13:28 Corey – Out of H2/Squeezer bay
13:40 Andres – Going into the LVEA looking for parts
13:40 Bubba – Going to Mids and Ends to drop off filters
14:16 Andres – Out of LVEA
14:55 Travis & Sudarshan – Going to End-X to work on PCal camera 
15:19 Rick – Going to End-Y to work on PCal cameras