Installed dust monitor (Location #2) at BSC10 for the ETM-Y Vent. Filiberto and Manny worked cabling issues with the location #2 dust monitor dropping network connection. Will run the dust monitor for 24 hours and check its operation. Installed a dust monitor near the door at HAM-1(Location #1) for the vent of HAM-1 next week. Will monitor and establish a base line ahead of opening the chamber.