3IFO SUS Storage Moves
Bubba G. Andres R. & Jeff B. 

   This morning, after placing a 4" wafer in the center of the container, we sealed the 3IFO Storage container #3 and moved it into its long term storage location. The C3 cover over the suspensions was arranged so as to allow free N2 circulation, (see photos below).   

   Storage Container #2 was moved into the loading position and the cleanroom was moved back into place. The container is ready to accept the last group of suspension for storage.

   The six suspensions (the last of the SUS/TMS suspensions from the staging building) that were staged by the High-Bay door were also craned over the beam tube. These are the bulk of the suspension to be loaded into Storage Container #2.      