H1 SUS
filiberto.clara@LIGO.ORG - posted 16:34, Tuesday 16 December 2014 - last comment - 07:51, Wednesday 17 December 2014(15656)
ETMY ESD
Betsy, Filiberto, Gerardo, Richard, Travis

1. The old vacuum feedthrough was removed by Gerardo
2. Continuity test were done on each pin to verify each section LR, UR, BIAS, UL, and LL.
3. The in-vacuum cables were re-terminated for installation of the new UHV 5-way coaxial connector.
4. Gerardo installed new feedthru (has not been leaked checked).
5. In-vacuum and in-air cables were connected to feedthru.
6. All pins were HIPOT to 1K and passed (some pins had to be reterminated).
6. Pin layout for ESD is as follow:
   Pin 1 - LR
   Pin 2 - UR
   Pin 3 - BIAS
   Pin 4 - UL
   Pin 5 - LL
Comments related to this report
gerardo.moreno@LIGO.ORG - 07:51, Wednesday 17 December 2014 (15666)
The ESD feedthrough was removed and replaced, flange will need to be leak tested.
Images attached to this comment