Reports until 18:26, Monday 17 October 2011
H2 AOS
craig.conley@LIGO.ORG - posted 18:26, Monday 17 October 2011 (1578)
End of Craig and Jesse's week visit at LHO
The attached photos show the state we left the suspended TMS/Dummy Telescope system in. The load is balanced and leveled and the six OSEMS are well centered. The SUS cables are attached to the six OSEMs per the CDS wiring diagram. The other ends of the SUS cables have yet to be connected to the incoming signal cables as this is where we ran out of time (actually Jesse was still on hand for a while longer, and tied the cables in a more orderly fashion than shown using peek pull ties).

Next we need to mount an interface plate to the Bosch frame to support the connection of the two incoming signal cables to the two SUS cables.
Images attached to this report