Reports until 16:58, Thursday 08 January 2015
LHO General
patrick.thomas@LIGO.ORG - posted 16:58, Thursday 08 January 2015 (15942)
Ops Summary (after 9am)
09:03 Vern to end X
09:07 Jim W. and Sebastian to LVEA to turn off HAM3 HEPI pier pods
09:14 Hugh craning in LVEA
09:26 Jim W. and I turned off sensor correction at end Y
09:31 Corey and Grant to the squeezer bay
09:37 Jeff B. and Andres to LVEA west bay to move 3IFO parts
09:43 Travis to end X
09:57 Hugh craning in LVEA
10:00 Jodi out of LVEA, reports clean room between HAM2/3 is on
10:03 Doors back on end X
10:39 Mitchel parking crane in LVEA
10:52 Hugh and Mitchel out of LVEA
10:57 Rick to end Y to work on photon calibrator
11:11 Sheila and Evan turned off clean room at HAM1
11:12 Manny done
11:19 Pepsi truck through gate
11:35 Jeff B. and Andres out of LVEA
11:48 Doug measuring distances for optical lever light pipes near HAM3/4
11:55 Kyle and Gerardo back from end X (started pumping)
12:52 Betsy putting parts in the cleaning bay
13:02 Filiberto to end X to look at cabling
13:04 Corey to squeezer bay
13:28 Aaron to end Y, PCAL cabling
13:51 Aaron done
14:40 Elli working on IOT2

Cyrus and I ran fsck on h1conlog3
Dave tested compilation of frontend models against RCG 2.9
In chamber work was completed at end X