Schedule for BSC09

Schedule for BSC09 "Abbreviated Vent & Closure"- II: Earth Quake Stop Adjustment of EX PUM Stage, January 9, 2015

Approved work to be done:

  1.  Assessment of earth quake stops gaps for the test mass and pum stage
  2.  Set lower  EQ stops gaps to ~1.5 mm of test mass and pum stages

Friday, Jan. 9

AM

PM

The last step is at the time and discretion of the Vacuum crew.