Reports until 16:20, Friday 09 January 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:20, Friday 09 January 2015 (15976)
Ops Shift Summary
LVEA: Laser Hazard
Observation Bit: Commissioning  

08:00 Jodi & Rodica – In LVEA looking for IO parts
08:13 Manny – Removing test stand cables from LVEA west bay
08:30 Jodi – Out of LVEA
09:00 Jodi – In LVEA working with Rodica on IO
09:12 Hugh – In LVEA working on 3IFO HAM storage retrofits 
09:18 Elli – Working on IOT2R table
09:20 Mitch – Going to LVEA for HAM 3IFO storage work
09:25 Filiberto – Going into LVEA to help Manny with removing cables from the west bay
09:29 Jodi – Out of the LVEA
10:30 Kyle – At End-X to start vent
10:31 Peter & Rick – Going to End-Y to work on PCal camera focus
10:31 Hugh & Mitch – Out of the LVEA
10:34 Travis – Going into the cleaning area to get tools for End-X vent
11:24 Doug – Checking TCS chiller alarm
11:49 Filiberto – Out of LVEA
11:49 Filiberto – Going to End-Y and End-X to check on TCS equipment
12:00 Electrical inspector on site to inspect work at VPW
12:00 Manny – Out of the LVEA
12:05 Doug – Out of the LVEA
12:08 Jodi & Rodica – Out of the LVEA
12:35 Jodi & Rodica – Going to Mid-Y to check on 3IFO IO parts 
13:17 Filiberto – Back from end stations
13:20 Jodi & Rodica – Back from Mid-Y
13:36 Sudarshan – Working on PCal cameras at End-Y
13:45 Kyle & Gerardo – At End-X working on BSC9 vent
14:05 Corey – Going to squeezer bay
14:40 Kyle & Gerardo – Back from End-X
14:56 Dale – Taking tour into LVEA 
14:57 Bubba & Kyle – Going to End-X to remove BSC9 door
14:57 Travis & Betsy – Gathering tools and heading to End-X for EQ stop work
15:17 Elli – Going to IOTC2R to check on fan noise
15:35 Corey – Out of the squeezer bay
15:43 Betsy – Going to End-X for Quad EQ stop work