Reports until 16:27, Friday 21 October 2011
LHO General
patrick.thomas@LIGO.ORG - posted 16:27, Friday 21 October 2011 (1601)
dust monitor in ISCT4
I added a branch to the vacuum line for the H2 PSL over to ISCT4. I attached it to a model 227B dust monitor there with its internal pump removed. It should be running now at location 1 in the LVEA.